Heat Treatment Cost Calculator

Heat treatment is quoted as a price per kilogram plus a minimum charge per batch, so at low volumes the minimum — not the weight — sets the unit price. This calculator separates the weight charge, the batch minimum, straightening, hardness testing and inbound freight, and returns both a per-part and a whole-batch figure.

¥— per part
Heat treatment
—
Straightening
—
Hardness tests
—
Freight share
—

Batch total — CNY · effective rate — CNY/kg

Error range ±30%. Heat treatment prices vary widely with furnace type, loading method and region: vacuum, sealed-quench and continuous furnaces are not the same market. The model prices by weight and ignores loading density — thin plates and long shafts occupy furnace volume without weight, so their real rate per kilogram is higher.

How the cost is built up

Formulas

batch weight      = part weight × batch size
weight charge     = batch weight × rate
batch treatment   = max(weight charge, batch minimum)
treatment / part  = batch treatment ÷ batch size

testing / part    = tests × fee ÷ batch size
total / part      = treatment + straightening + testing + freight

Worked example

0.8 kg 45-steel part, 200 pieces, quench and temper (¥6.50/kg, min ¥100), ¥0.30 straightening, two tests at ¥30:

Batch weight (160 kg × ¥6.50 = ¥1040, above the minimum)¥5.20 / part
Straightening and fixturing¥0.30
Hardness testing (¥60 ÷ 200)¥0.30
Freight share¥0.05
Total¥5.85 / part (batch ¥1,170)

Now set the batch to 10: the batch weighs 8 kg, the weight charge is ¥52, below the ¥100 minimum, so treatment is billed at ¥100 ÷ 10 = ¥10 per part. The total jumps to ¥16.35 (testing is spread over 10 parts too) and the effective rate becomes ¥12.50/kg — nearly double the list price. That is where “small batch surcharge” on a heat-treatment quotation comes from.

In-house versus outsourcing

A heat-treat line is heavy capital: a box furnace with quench tank, a tempering furnace and a hardness tester starts in the hundreds of thousands, plus a process engineer. Unless the product mix is stable and volume runs to tens of tonnes a month, outsourcing wins — their price already carries furnace depreciation, but you carry no fixed cost. The test is simple: compare the outsourced rate × annual weight against in-house depreciation, energy and labour.

Not included

Common questions

Why is heat treatment priced per kilogram?

Because furnace cost follows the weight loaded: how many kilograms per cycle, how much gas and power. The number of parts barely matters. A supplier quoting per part is really estimating part weight and loading density for you.

What is a typical batch minimum?

¥50–200 per batch for plain hardening, ¥200–500 for carburising and nitriding, ¥300–800 for vacuum hardening. Above a few hundred parts the minimum fades; below it, it is the whole price.

Does everything need straightening after quenching?

Parts with high length-to-diameter ratio, asymmetric sections or thin walls almost always do. Short, stout parts, or those ground afterwards with allowance, often do not. Straightening is manual press work: a few tenths of a yuan to a few yuan per part.

Carburising or nitriding?

Carburising gives a deeper case (0.3–1.5 mm) with a gentler hardness gradient at moderate cost — gears and shafts. Nitriding gives a thin, harder, low-distortion case (0.1–0.3 mm) at low temperature, suited to finish-machined parts, but cycles are long and the rate is higher.