Manufacturing cost glossary
The words that keep appearing in quotations and process sheets, each explained in one sentence. Every entry links to the calculator that uses it, so you can read the definition and put numbers into it in the same minute. 37 terms, grouped by process.
General
- Should-cost
- The cost a part ought to have, built up from process, material and time instead of taken from a quotation. It is not the lowest price — it is a defensible one.
- Machine rate
- The all-in hourly cost of a machine: depreciation, power, operator and overhead. Injection presses, presses and CNC centres differ by an order of magnitude. → Machining cost
- Setup
- Clamping the work, touching off tools and proving the program. Setup time is divided by batch size, so small batches carry most of it. → Machining cost
- Secondary operations
- Work after the primary forming step: deburring, tapping, washing, polishing, printing. Usually priced per part. → Stamping cost
- Scrap rate and yield
- Scrap is the share of started parts that are rejected; yield = 1 − scrap. Material and machine time are both grossed up by yield. → Molding cost
- MOQ
- The minimum order quantity a supplier will accept. Below it, tooling, setup and line-change costs spread over too few parts and the unit price jumps. → Packaging cost
- Tolerance
- The permitted dimensional deviation. Tighter tolerances slow machining and add inspection and rejects, so cost rises non-linearly. → Machining cost
- Fixtures and tooling
- Dedicated devices that locate, clamp and support the workpiece. Job shops use general fixtures for small batches; volume work needs dedicated fixtures, often quoted separately.
- Trial run
- The first run of a new tool to prove fill, dimensions and appearance. It is charged as press time, material and technician hours. → Mold cost
Molding and die casting
- Cavities
- How many parts one shot produces. More cavities cut machine time per part but raise tool cost and press tonnage. → Molding cost
- Cycle time
- From clamp closed to clamp closed again: injection, hold, cooling, opening and ejection. Cooling is usually more than half of it.
- Shot weight
- The total material injected per cycle: part weight plus runner and sprue. Material is priced on shot weight, not net part weight. → Part weight
- Runner ratio
- Runner weight as a share of part weight. Cold runners commonly run 5–15%; hot runners approach zero. → Part weight
- Shrinkage
- How much a plastic or alloy shrinks as it cools. Cavities are cut oversize by the shrinkage factor, which varies by material.
- Draft angle
- A small taper on walls so the part releases. Too little draft causes scuffing, stress whitening and sticking.
- Tooling amortisation
- Spreading a one-off tool cost over production: die cost ÷ life in shots × shots consumed per part. → Mold cost
- Tool life in shots
- Shots a tool survives before major repair or retirement. Injection molds commonly reach 300,000–1,000,000; die casting dies 50,000–200,000. → Die casting cost
- Flash and burr
- Excess material at the parting line or sheared edge. Removing it is the main driver of secondary operation cost.
Sheet metal and stamping
- Flat pattern area
- The sheet area of a folded part once unfolded, used for material cost. Bend allowance (K-factor) sets the developed length. → Sheet metal cost
- Coil utilization
- The share of a sheet or coil that becomes parts. Irregular parts, multi-row nests and wide coils move this figure a lot. → Stamping cost
- Stroke rate (SPM)
- Press strokes per minute. On a progressive die it is the strip index rate, and each stroke may produce one or several parts. → Stamping cost
- Cut speed
- Millimetres per minute a laser or plasma torch travels. It falls roughly as a power law with thickness. → Sheet metal cost
- Bend count
- How many bends a part needs. Every bend costs handling and positioning, so past six to eight bends it dominates the price. → Sheet metal cost
Machining and finishing
- Material removal rate (MRR)
- Volume cut per minute in cm³/min. Roughing maximises it; finishing trades speed for surface quality. → Machining cost
- Stock
- The raw billet or bar before machining, sized with allowance. Stock volume drives material cost; removed volume drives machine time. → Machining cost
- Tool cost
- Cutting tool consumption per part. Hard materials, deep pockets and tight tolerances all accelerate wear. → Machining cost
- Surface roughness (Ra)
- Arithmetic mean deviation of the surface profile, in micrometres. Lower Ra needs more passes and costs more. → Surface finishing
- Anodising
- Growing an oxide layer on aluminium in an electrolyte, dyeable. Priced by area, with surcharges for dark colours and hard anodising. → Surface finishing
- Powder coating
- Electrostatically applied powder cured in an oven. Thicker and more weather-resistant than paint, priced by area and colour. → Surface finishing
- Plating
- Depositing zinc, nickel or chrome electrolytically. Priced by area; rack plating and barrel plating have different cost structures. → Surface finishing
- Masking
- Protecting areas that must stay uncoated — threads, contacts, mating faces — during finishing. Priced as labour and consumables. → Surface finishing
Packaging and freight
- Blank area (packaging)
- The flat paper area of a box before folding, the basis for board and printing cost. → Packaging cost
- Cutting die
- A one-off tool that punches the board into its box shape, priced by material and complexity and amortised over the batch. → Packaging cost
- Chargeable weight
- Air freight bills the greater of actual weight and volumetric weight (L×W×H/6000). → Freight cost
- Volumetric weight
- Weight implied by carton dimensions, reflecting space rather than mass. Light bulky cargo is billed on it. → Freight cost
- LCL
- Less than container load: several shippers share a container, billed per cubic metre. → Freight cost
- FCL
- Full container load: one shipper takes a 20GP or 40HQ, billed per container; excess volume means another container. → Freight cost
How to use the glossary
First work out which basis a quotation is priced on: weight, area, shots, or machine hours. If the basis does not match, the comparison is meaningless — an injection molding quote prices material on shot weight, so checking it with net part weight understates material by 5–15%. Once the basis matches, open the linked calculator, enter the supplier's process parameters and compare the result with their price.
These are engineering conventions; individual factories word things differently. When a term is ambiguous — “processing fee” sometimes includes material and sometimes does not — ask what is included rather than guessing.