Injection Mold Cost Estimator
Estimate what a new injection mold should cost, and see which of the four drivers — cavity machining, mold base, steel grade, trial runs — dominates your quote.
Composite multiplier —× (complexity × precision)
Accuracy: ±35%. Tooling quotes vary more than part costs because they depend on the toolmaker's capacity, payment terms and how much risk they price in. This gives you the order of magnitude and the structure — not a substitute for three quotes.
What drives mold cost
- Cavity work — the largest line. Roughly linear in cavity count, and grows sub-linearly with part area because bigger parts need deeper roughing but not proportionally more finishing.
- Mold base — a standard steel frame sized by the total footprint (per-part area × cavities). Grows with the square root of footprint.
- Steel grade — S136 or H13 for corrosive resins or high polish adds a fixed premium; the number is small next to cavity work until you need hardened tool steel.
- Trial runs — one or more shot samples. Multi-cavity molds cost more to trial because balancing all cavities takes longer.
Formula
cavity_work = (3000 + 60 × area_cm2^0.6) × cavities
mold_base = 5000 + 200 × √(area_cm2 × cavities)
steel = 0 / 3000 / 8000 (standard / enhanced / premium)
trial = 1500 (single cavity)
= 3000 (multi-cavity)
total = (cavity + base + steel + trial) × complexity × precision
complexity: 1.0 / 1.3 / 1.9 precision: 1.0 / 1.25 Worked example
100 cm² part, 2 cavities, medium complexity, 718H steel:
| Cavity work (2 × ¥3,951) | ¥7,901 |
| Mold base (√200 × ¥200 + ¥5,000) | ¥7,828 |
| Steel surcharge | ¥3,000 |
| Trial runs | ¥3,000 |
| Subtotal × 1.3 (medium) | ¥28,249 |
What this does not include
- Hot runner systems (often ¥10k–60k on their own)
- Design and DFM review fees
- Engineering changes after first trial
- Fixture, gauges, packaging and freight
- Payment terms and tooling ownership clauses
FAQ
Why does one quote come in at half of another?
Usually three reasons: the cheap one uses a smaller mold base with less safety margin, trial runs are excluded or billed separately, or the toolmaker is pricing a simpler ejection scheme than you assumed. Ask each supplier to break the quote into the same four lines this calculator uses — the difference immediately becomes visible.
Is a multi-cavity mold worth it?
Compare cost per part: doubling cavities roughly doubles cavity work but halves machine time per part. For annual volumes above roughly 100k parts, 2–4 cavities usually pays back within a year; below 20k, single cavity is almost always cheaper.
How accurate is the steel surcharge?
It is a fixed allowance, not a material calculation. Real premium varies with mold size: on a large mold, hardened steel can add far more than ¥8,000. Treat it as a floor.