CostKit

CNC Machining Cost Calculator

Estimate the per-part cost of a milled or turned part: material, machining time, setup amortization and tooling. Built for judging whether a machine shop's quote is plausible before you negotiate.

¥— per part, excluding finishing and inspection
Material
—
Machining
—
Tooling
—

Total time per part — min (cutting + amortized setup)

Accuracy: ±30%. Machining cost depends heavily on the programmer, the fixture and the machine, far more than on geometry. Removal rate is a mid-range shop value, not a theoretical peak. Finishing operations, heat treatment, inspection and packaging are not included.

How the estimate is built

Formula

stock_weight_g = stock_volume_cm3 × density
material   = stock_weight_g / 1000 × price_per_kg / (1 − scrap_rate)

cutting_min = removal_volume_cm3 / mrr_cm3_per_min
setup_min   = setup_minutes × setups / batch_size
minutes     = cutting_min + setup_min

machining  = minutes / 60 × machine_rate_per_hour
total      = material + machining + tooling

Inputs explained

InputMeaningTypical range
Stock volumeRaw block/billet before machining5–2000 cm³
Removal volumeStock minus finished part20–80% of stock
Setup timeClamping, zeroing, tool changes per fixturing15–60 min
SetupsHow many times the part is re-fixtured1–4
Machine rate3-axis: ¥80–150/h, 5-axis: ¥200–400/h80–400 ¥/h
ToolingCutters consumed per part¥1–30

Worked example

6061 aluminium, 200 cm³ stock, 120 cm³ removed, 2 setups of 30 min, ¥120/hour, ¥5 tooling, 2 % scrap, batch of 100:

Material (540 g @ ¥25/kg)¥13.78
Machining (3.0 min cutting + 0.6 min setup)¥7.20
Tooling¥5.00
Total¥25.98 per part

Change the batch to 5 parts and the setup term alone becomes 12 minutes per part: the same part costs over ¥55. Batch size, not the drawing, is usually what makes a quote look wrong.

What this does not include

FAQ

Why does my quote differ by more than 30 %?

Machining is the most shop-dependent of the common processes. The same drawing can legitimately cost 2× more at a shop with older machines, manual programming, or a fixture that has to be built from scratch. Compare the machine rate and setup time assumptions before doubting the model.

Should I enter stock volume or finished volume?

Both matter, separately. Material is charged on stock; machining time is driven by the difference. Entering the finished volume as stock is the most common way to under-estimate cost by 30–60 %.

How do I estimate removal volume?

From CAD: stock bounding box minus part volume, plus holes and pockets. For a quick check, simple prismatic parts typically remove 40–70 % of stock; thin-walled parts can exceed 80 %.

Does this work for turning or EDM?

The model is generic for material removal. Turning is close enough; EDM and wire-cutting are much slower per cm³ and need their own removal rates — do not use the milling values.