CostKit

Plastic Part Weight & Material Usage

Weight first, cost second. Enter the part volume and the material, and get net weight, shot weight including runner, consumption per part after scrap, and how many parts one kilogram of resin actually yields.

— g net weight
Net part
—
Runner
—
Scrap allowance
—
Shot weight (part + runner)— g
Consumption per good part— g
Batch total— kg
Batch material cost¥—
Parts per kilogram—

This is arithmetic, not estimation. Given volume and density the weight is exact. The uncertainty is in your volume figure and in the runner ratio — measure both before trusting the batch cost.

Why shot weight matters more than part weight

Every article about plastic parts quotes the part weight, but you buy resin by the shot. The runner, sprue and overflow are moulded every cycle and then reground or discarded. A 5% runner sounds trivial until you order 500,000 parts: it is 25,000 extra parts worth of resin.

Formula

net_weight     = volume_cm3 × density
shot_weight    = net_weight × (1 + runner_ratio)
consumption    = shot_weight / (1 − scrap_rate)
batch_kg       = consumption × batch_size / 1000
batch_cost     = batch_kg × price_per_kg
parts_per_kg   = 1000 / consumption

Worked example

ABS part, 100 cm³, 5% runner, 1,000 pieces, 3% scrap:

Net weight: 100 × 1.04104.0 g
Shot weight: × 1.05109.2 g
Consumption: ÷ 0.97112.6 g
Batch: 112.6 g × 1,000112.6 kg
Cost at ¥13/kg¥1,463.51
Parts per kilogram8.88

Note the gap: the part weighs 104 g but you buy 112.6 g of resin for each good one. That 8% difference is runner plus scrap, and it is the first thing to attack if the material line looks high.

What this does not include

FAQ

How do I get the part volume?

From CAD, have the modelling software report solid volume — do not estimate from bounding box dimensions, which overstates by 30–60% for typical housings. From a physical sample, weigh it on a scale and divide by density: weight is often easier to obtain than volume.

What is a normal runner ratio?

For a single-cavity mould with a direct sprue, 3–8%. For multi-cavity moulds with long runners, 10–25%. Hot runner systems reduce it to near zero, which is why they pay back quickly on expensive resins.

Should scrap be counted against resin or against parts?

Both, but they are not the same number. A 3% scrap rate means 3% of shots are lost, so you consume 100/97 = 103.1% of the resin per good part — not 103%. For small percentages the difference is tiny, but at 20% scrap it becomes 125%, and that surprises people.