CostKit

Die Casting Machine Tonnage & Shot Sleeve Fill Calculator

"Can this machine run the job?" is really two questions: is the clamp force enough, and does the shot sleeve hold the shot? Get the first wrong and you flash or blow the die apart; get the second wrong and the shot bottoms out before the cavity fills. Both scrap the whole die. This tool answers both, then names the standard machine size and tells you whether the fill ratio sits in a workable window.

1. Clamp force and machine tonnage

— t (recommended machine)
Total projected area (all cavities)— cm²
Theoretical clamp force— kN
Design clamp force (with safety factor)— t
Clamp force of selected machine— kN
Machine utilisation— %
Next size up— t

2. Shot sleeve fill ratio

Fill ratio is the metal volume one shot needs divided by the usable volume of the shot sleeve. Too small a sleeve and the plunger bottoms out before the cavity is full; too large a sleeve and the trapped air turns into porosity and oxide inclusions. General-purpose work sits between 40% and 80%.

— % shot sleeve fill

—

Usable sleeve volume— cm³
Metal volume per shot— cm³
Biscuit weight— g
Shot weight (pour weight)— g
Remaining sleeve volume— cm³

±20%. The projected area must include runners, overflow and air vents — on thin-wall aluminium parts that is easily a third of the total. Specific pressure moves with alloy, wall thickness and leak-tightness requirements. This tool checks clamp force and sleeve volume only; it does not check die opening stroke, tie-bar spacing, ejection force or die thickness — a machine can have plenty of tonnage and still not accept the die.

Formulas

Clamp force (kN) = projected area (cm²) × specific pressure (MPa) × 0.1 × safety
Sleeve volume (cm³) = π/4 × bore² (mm²) × stroke (mm) ÷ 1000
Metal volume = casting volume × (1 + runner share) + biscuit volume
Fill ratio (%) = metal volume ÷ sleeve volume × 100

The 0.1 factor is unit conversion: 1 MPa = 1 N/mm² = 100 N/cm² = 0.1 kN/cm². One tonne of clamp force is about 9.81 kN, so 1656 kN is roughly 169 t.

Worked example

120 cm² projected area including overflow, 2 cavities, aluminium at 60 MPa, safety 1.15:

Total projected area120 × 2 = 240 cm²
Theoretical clamp force240 × 60 × 0.1 = 1440 kN
Design clamp force1440 × 1.15 = 1656 kN ≈ 168.9 t
Recommended machine200 t (1961 kN clamp), utilisation 73%
Same part in zinc at 40 MPa960 kN → 1104 kN design ≈ 112.6 t → 160 t machine
Four cavities instead of two2880 kN → 3312 kN design ≈ 337.7 t → 400 t machine

Sleeve: 60 mm bore, 400 mm stroke, 25 mm biscuit, 380 cm³ casting, 25% runners, aluminium at 2.7 g/cm³:

Sleeve volumeπ/4 × 60² × 400 ÷ 1000 = 1130.97 cm³
Biscuit volumeπ/4 × 60² × 25 ÷ 1000 = 70.69 cm³
Metal volume per shot380 × 1.25 + 70.69 = 545.69 cm³
Fill ratio545.69 ÷ 1130.97 = 48.25% (inside the window)
Shot weight545.69 × 2.7 ≈ 1473 g

Specific pressure is not intensification ratio

Quotes often mix the two. Specific pressure (MPa) is the metal pressure acting on the projected area and it sets the clamp force. The intensification ratio is the ratio of shot force after the intensifier fires to the force before it, and it decides whether the last bit of feed metal gets pushed in before the gate freezes. This calculator handles the first. The second depends on the shot cylinder area, accumulator pressure and intensifier setting — machine parameters you cannot derive from part geometry.

The three fill ranges

Four common mistakes

Not included

FAQ

Utilisation is only 73% — why not the next size down?

Machine sizes are discrete. A 168.9 t design clamp rounds up to the nearest 200 t machine; a 160 t machine clamps at 1569 kN, below the 1656 kN required, and will flash. Below 50% utilisation the better move is to change cavity count or machine series, not to force a bigger press.

Why do zinc parts need less tonnage?

Zinc flows well and needs only 30–50 MPa specific pressure, so clamp force is roughly half to seventy percent of an aluminium part of the same size. But zinc is 6.6 g/cm³, so the same sleeve holds more than twice the shot weight — check sleeve capacity separately.

Does a good fill ratio guarantee good castings?

No. Fill ratio only says the shot fits and the sleeve is not mostly air. Shot velocity, venting, die temperature and die release agent decide porosity and cold shuts, and only a trial run plus X-ray confirms those. This tool's job is to rule out machines that clearly cannot run the job at the quotation stage.