CostKit

Extrusion Cost Calculator

Extrusion is costed differently from injection moulding. Moulding is "one shot, one part, costed in seconds"; extrusion is "one line, continuous output, costed in metres". To price a 2 m HDPE pipe you do not divide a mould cost by output — you count the grams inside that 2 m, add the seconds of line time it occupies, and then the die amortisation and start-up scrap. This tool splits those items apart and also reports cost per metre and good pieces per hour, which are the two numbers worth comparing against a supplier quote.

1. Inputs

Not sure what to enter? Use the extrusion die cost estimator to size a head first. Hollow parts (bottles, drums, cases) are blown, not cut to length: use the blow molding cost calculator.

¥ — per piece
Material, scrap included— CNY
Line time— CNY
Die amortisation— CNY
Start-up scrap share— CNY
Secondary operations— CNY
Weight per piece— g
Good pieces per hour— /h
Cost per metre (material + line time)— CNY/m

±25%. Material and haul-off speed are the reliable inputs — resin price and line speed come off real shop-floor records. The soft spots are the die amortisation quantity and the secondary operations: a die is re-amortised every time the profile changes, and drilling or film is routinely buried in a "processing" line on quotes. Use the supplier's own numbers for those two and the estimate gets much closer.

Formulas

volume per piece (cm³) = section area (mm²) × cut length (mm) ÷ 1000
weight per piece (g)   = volume × density
material (cents)       = weight ÷ 1000 × price (cents/kg) ÷ (1 − scrap)
line time (min)        = cut length ÷ 1000 ÷ haul-off speed (m/min)
line cost (cents)      = line time ÷ 60 × rate (cents/h) ÷ (1 − scrap)
die amortisation       = die cost ÷ amortisation quantity
start-up scrap (cents) = scrap kg × price ÷ pieces in batch
total (cents)          = material + line cost + die + start-up + secondary

The two unit factors in the first line cancel exactly: when the section area is given in mm², the volume of one metre is numerically equal to the section area in cm³. A 250 mm² profile is 250 cm³ per metre; at 0.95 g/cm³ that is 237.5 g per metre. Remember that coincidence and you can do material weight in your head on the shop floor.

What each input means

Worked example

HDPE, 250 mm² section, 2000 mm cut length, 6 m/min, 120 CNY/h, die 8,000 CNY over 50,000 pieces, 50 kg start-up scrap, 5,000 pieces in the batch, 3% scrap (the page defaults):

Volume per piece250 × 2000 ÷ 1000 = 500 cm³
Weight per piece500 × 0.95 = 475 g
Material475 ÷ 1000 × 9.5 = 4.5125 CNY → ÷ 0.97 = 4.65 CNY
Line time2.0 m ÷ 6 m/min = 0.3333 min
Line cost0.3333 ÷ 60 × 120 = 0.6667 CNY → ÷ 0.97 = 0.69 CNY
Die amortisation8,000 ÷ 50,000 = 0.16 CNY
Start-up scrap50 × 9.5 ÷ 5,000 = 0.10 CNY
Total4.65 + 0.69 + 0.16 + 0.10 = ¥5.60 per piece
Output60 ÷ 0.3333 × 0.97 = 174.6 pieces/h
Per metre(4.65 + 0.69) ÷ 2 = 2.67 CNY/m

Same line, three changes:

Section 250 → 500 mm²950 g; material 9.30; line cost still 0.69 → ¥10.25/part
Switch to PVC (1.42 g/cm³, 9.00/kg)710 g; material 6.59; start-up 0.09 → ¥7.53/part
Haul-off 6 → 12 m/minline time 0.1667 min; line cost 0.34 → ¥5.25/part, output doubled

The first row is the one to remember: doubling the section does not double the price (10.25 < 11.20), because die amortisation and start-up scrap are fixed per piece. Conversely, a large-section profile is almost all material — the only levers are resin choice and wall thickness. Neither machine time nor batch size moves it. That is the usual negotiating mistake on extruded profiles: trying to squeeze a big-section part with volume.

How extrusion costing differs from moulding

Four common mistakes

Not included

FAQ

Why report cost per metre when the tool prices per piece?

Extrusion is quoted per metre, while purchase orders are placed per piece. Showing both prevents an apples-to-oranges comparison when cut lengths differ: at 2.67 CNY/m, a 2 m piece is 5.60 and a 3 m piece is 7.98 — material and line time scale linearly while the fixed items get diluted.

Can I use this for blow-moulded bottles?

For the parison only. A full blow-moulding cost adds clamp and blow time, mould amortisation (far more expensive than a die) and neck trimming. If the question is simply "is the shot weight right", the section-area × length approach transfers directly.

What haul-off speed should I enter?

Ask the line operator, not the machine datasheet. Nameplate maximum is an unloaded figure; the real speed is set by wall thickness, cooling tank length and downstream puller sync. If nobody knows, back-calculate from "metres produced per hour at this section and resin".

What if the estimate is far from the quote?

Align three things first: net section area, cut length, and whether the quote includes post-processing and packing. Once aligned, expect agreement within ±25%. A factor-of-two gap usually means co-extrusion layers, masterbatch or UV stabiliser — additives can add 10–20% to material cost and are not itemised here.