Extrusion Cost Calculator
Extrusion is costed differently from injection moulding. Moulding is "one shot, one part, costed in seconds"; extrusion is "one line, continuous output, costed in metres". To price a 2 m HDPE pipe you do not divide a mould cost by output — you count the grams inside that 2 m, add the seconds of line time it occupies, and then the die amortisation and start-up scrap. This tool splits those items apart and also reports cost per metre and good pieces per hour, which are the two numbers worth comparing against a supplier quote.
1. Inputs
| Material, scrap included | — CNY |
| Line time | — CNY |
| Die amortisation | — CNY |
| Start-up scrap share | — CNY |
| Secondary operations | — CNY |
| Weight per piece | — g |
| Good pieces per hour | — /h |
| Cost per metre (material + line time) | — CNY/m |
±25%. Material and haul-off speed are the reliable inputs — resin price and line speed come off real shop-floor records. The soft spots are the die amortisation quantity and the secondary operations: a die is re-amortised every time the profile changes, and drilling or film is routinely buried in a "processing" line on quotes. Use the supplier's own numbers for those two and the estimate gets much closer.
Formulas
volume per piece (cm³) = section area (mm²) × cut length (mm) ÷ 1000
weight per piece (g) = volume × density
material (cents) = weight ÷ 1000 × price (cents/kg) ÷ (1 − scrap)
line time (min) = cut length ÷ 1000 ÷ haul-off speed (m/min)
line cost (cents) = line time ÷ 60 × rate (cents/h) ÷ (1 − scrap)
die amortisation = die cost ÷ amortisation quantity
start-up scrap (cents) = scrap kg × price ÷ pieces in batch
total (cents) = material + line cost + die + start-up + secondary The two unit factors in the first line cancel exactly: when the section area is given in mm², the volume of one metre is numerically equal to the section area in cm³. A 250 mm² profile is 250 cm³ per metre; at 0.95 g/cm³ that is 237.5 g per metre. Remember that coincidence and you can do material weight in your head on the shop floor.
What each input means
- Section area — the net wall area, not the bounding box. For a hollow tube compute π × (OD² − ID²) / 4; if the customer gives OD and wall thickness, convert it yourself. Using the bounding box inflates material several times over.
- Haul-off speed — how fast the puller drags the profile. It sets line cost and hourly output: 6 m/min versus 12 m/min halves the line cost and leaves material untouched. It is limited by cooling tank length and wall thickness, so it is not a free lever.
- Line rate — screw and barrel depreciation, heater power, chillers and operator combined. Small single-screw lines commonly run 60–120 CNY/h; twin-screw compounding or large profiles go well past 200 CNY/h.
- Die / sizing sleeve — one die, one cross-section. Amortised over the quantity you expect to run; changing profile means a new die and a fresh amortisation.
- Start-up scrap — the first metres after a material or profile change are out of tolerance; a few kilos to tens of kilos is normal. Spread over the batch, it hurts small runs badly.
- Scrap rate — inflates material and line time only. Rejects waste resin and machine time but do not consume die life or secondary operations.
Worked example
HDPE, 250 mm² section, 2000 mm cut length, 6 m/min, 120 CNY/h, die 8,000 CNY over 50,000 pieces, 50 kg start-up scrap, 5,000 pieces in the batch, 3% scrap (the page defaults):
| Volume per piece | 250 × 2000 ÷ 1000 = 500 cm³ |
| Weight per piece | 500 × 0.95 = 475 g |
| Material | 475 ÷ 1000 × 9.5 = 4.5125 CNY → ÷ 0.97 = 4.65 CNY |
| Line time | 2.0 m ÷ 6 m/min = 0.3333 min |
| Line cost | 0.3333 ÷ 60 × 120 = 0.6667 CNY → ÷ 0.97 = 0.69 CNY |
| Die amortisation | 8,000 ÷ 50,000 = 0.16 CNY |
| Start-up scrap | 50 × 9.5 ÷ 5,000 = 0.10 CNY |
| Total | 4.65 + 0.69 + 0.16 + 0.10 = ¥5.60 per piece |
| Output | 60 ÷ 0.3333 × 0.97 = 174.6 pieces/h |
| Per metre | (4.65 + 0.69) ÷ 2 = 2.67 CNY/m |
Same line, three changes:
| Section 250 → 500 mm² | 950 g; material 9.30; line cost still 0.69 → ¥10.25/part |
| Switch to PVC (1.42 g/cm³, 9.00/kg) | 710 g; material 6.59; start-up 0.09 → ¥7.53/part |
| Haul-off 6 → 12 m/min | line time 0.1667 min; line cost 0.34 → ¥5.25/part, output doubled |
The first row is the one to remember: doubling the section does not double the price (10.25 < 11.20), because die amortisation and start-up scrap are fixed per piece. Conversely, a large-section profile is almost all material — the only levers are resin choice and wall thickness. Neither machine time nor batch size moves it. That is the usual negotiating mistake on extruded profiles: trying to squeeze a big-section part with volume.
How extrusion costing differs from moulding
- Tooling scale — extrusion needs a die and a sizing sleeve (a few thousand to tens of thousands CNY); injection moulding needs a whole mould base (tens to hundreds of thousands). For long, constant-section parts in modest volumes, extrusion is nearly always cheaper.
- Amortisation unit — per metre versus per shot. There is no "cavities" concept; output comes from line speed or a second line.
- Where secondary work sits — cutting to length, drilling, tapping, printing are not extrusion cost. Quotes usually split "extrusion" and "post-processing"; compare the sum, not the first line.
Four common mistakes
- Using the bounding box as the section area — a 40×20 rectangular tube with 2 mm wall is 224 mm² of material (36×16), not 800 mm². Wrong material cost poisons everything downstream.
- Forgetting that fixed items also land in the unit price — drop the batch from 5,000 to 500 pieces and start-up scrap alone goes from 0.10 to 0.95 CNY per piece.
- Quoting the trial line speed — the line may pass at 8 m/min during a trial, then run at 5 m/min in production to hold wall tolerance: 60% more line cost.
- Ignoring cutting and packing — cut-to-length, end finishing, cartons or stretch film are not in this model. Packing a 2 m pipe can add 0.5 CNY or more.
Not included
- Cutting, chamfering, end capping (use the secondary-operations field)
- Packaging — cartons, stretch film, pallets — and internal handling
- Regrind value of start-up scrap and edge trim, which can offset part of the material cost
- Factory rent, overhead and profit margin
- Blow moulding clamp, blow and cooling time — this tool prices the extruded parison only
FAQ
Why report cost per metre when the tool prices per piece?
Extrusion is quoted per metre, while purchase orders are placed per piece. Showing both prevents an apples-to-oranges comparison when cut lengths differ: at 2.67 CNY/m, a 2 m piece is 5.60 and a 3 m piece is 7.98 — material and line time scale linearly while the fixed items get diluted.
Can I use this for blow-moulded bottles?
For the parison only. A full blow-moulding cost adds clamp and blow time, mould amortisation (far more expensive than a die) and neck trimming. If the question is simply "is the shot weight right", the section-area × length approach transfers directly.
What haul-off speed should I enter?
Ask the line operator, not the machine datasheet. Nameplate maximum is an unloaded figure; the real speed is set by wall thickness, cooling tank length and downstream puller sync. If nobody knows, back-calculate from "metres produced per hour at this section and resin".
What if the estimate is far from the quote?
Align three things first: net section area, cut length, and whether the quote includes post-processing and packing. Once aligned, expect agreement within ±25%. A factor-of-two gap usually means co-extrusion layers, masterbatch or UV stabiliser — additives can add 10–20% to material cost and are not itemised here.