Bottles, jerry cans, shampoo packs, air ducts, hollow cases — anything blown into a cavity is extrusion blow molding. The unit there is not a metre of profile or a moulding shot; it is one parison: a tube of melt drops from the die head, the mould closes on it, air inflates it, it cools, the mould opens, the flash is trimmed. This tool splits the part cost into material, machine time, mould amortisation and trimming, and answers a question that is usually glossed over: how much does regrinding the flash actually save?

1. Inputs

Not sure what to enter? Estimate the mould and its cost per shot with the blow mould cost estimator.

¥ — per part
Material (net of regrind credit, scaled by yield)— CNY
Machine time— CNY
Mould amortisation— CNY
Trimming / deflashing— CNY
Material before credit— CNY
Regrind credit— CNY
Parison weight per part— g
Net material weight (regrind at 50%)— g
Flash / trim weight— g
Cycle time per part— s
Good output— parts/h

±30%. Material and cycle time are the reliable inputs; two others drift most: the flash ratio (up to 40% on large parts, just over 10% on narrow-neck bottles) and the trimming rate (0.1 CNY hand-trimmed, 0.3 CNY and up with an automatic deflasher). This is not a supplier quote — it says what the resin and machine time should cost.

Formula

yield            = 1 − scrap rate
gross material   = parison_g ÷ 1000 × price ÷ yield
net material (g) = parison_g × (1 − regrind ratio × 0.5)
material         = net_g ÷ 1000 × price ÷ yield
regrind credit   = gross material − material
cycle per part   = cycle per shot ÷ cavities
machine          = cycle per part ÷ 3600 × rate ÷ yield
mould amort.     = mould cost ÷ cavities ÷ mould life (shots)
trimming         = trim rate per part
total            = material + machine + mould + trimming

Material and machine time are both divided by yield: a scrapped part burns resin and occupies that slice of machine time. Mould amortisation and trimming are per-part fixed items and do not move with scrap — the mould cost is consumed per shot regardless. Regrind is credited at 50% of virgin price, the one parameter here that is not straight book arithmetic; the reason is in the section below.

What the inputs mean

Worked examples

HDPE, 120 g parison, 2 cavities, 25 s cycle, 180 CNY/h, 60,000 CNY mould over 1,000,000 shots, 0.12 CNY trimming, 20% regrind, 4% scrap (page defaults):

Yield1 − 0.04 = 0.96
Gross material120 ÷ 1000 × 9.50 = 1.14 → ÷0.96 = 1.19 CNY
Net material weight120 × (1 − 0.20 × 0.5) = 108 g
Material108 ÷ 1000 × 9.50 = 1.026 → ÷0.96 = 1.07 CNY (credit 0.12)
Cycle per part25 ÷ 2 = 12.5 s
Machine12.5 ÷ 3600 × 180 = 0.625 → ÷0.96 = 0.65 CNY
Mould amortisation60,000 ÷ 2 ÷ 1,000,000 = 0.03 CNY
Trimming0.12 CNY
Total1.07 + 0.65 + 0.03 + 0.12 = ¥1.87 per part, 276.5 parts/h

The same model with other conditions:

One cavity, 30 s cycle, 30,000 CNY mould, 10% regrind, 2% scrapmaterial 1.11 + machine 1.53 + mould 0.03 + trim 0.12 = ¥2.79
5 L drum: 500 g parison, one cavity, 60 s cycle, 240 CNY/h, 120,000 CNY mould over 500,000 shots, 0.30 trimmingmaterial 4.50 + machine 4.21 + mould 0.24 + trim 0.30 = ¥9.25
Same drum, mould life cut to 50,000 shots (aluminium, trial batch)mould 0.24 → 2.40, total ¥11.41

The third row is the cost that gets missed: the same drum costs 0.24 CNY of mould per part over 500,000 shots of steel tooling and 2.40 CNY over 50,000 shots of aluminium — more than the machine time. A high quote on a pilot batch usually means the mould has not been paid off yet, not that the moulder is gouging.

Why the parison is heavier than the part

The parison is a straight tube; the part is that tube inflated into the cavity. The difference goes to three places: the parting-line flash (a full ring), the pinch-off tab at the base or neck, and the wall allowance that keeps the blow-out even. Parison weight is therefore 1.2–1.4× the finished weight — higher for large or square parts, lower for narrow-neck round bottles. This is why a blow molding cost sheet has to start from the parison: backing material cost out of finished weight understates it by 20–40%.

Why regrind is credited at 50%

Ground flash can go back in, but the market price for regrind is never the virgin price: the polymer has been through a second heat history, impact strength drops, colour darkens (useless for clear bottles), and above roughly 30% regrind the wall thickness starts to scatter. Add the grinder's power and labour and the real credit lands at 40–60% of virgin price. This tool uses 50% as a conservative ceiling: if your regrind is really worth 30%, material cost is higher, not lower.

Blow molding vs injection molding vs extrusion

ShapeHollow, thin-walled, single opening (bottle, drum, case) → blow molding; solid or with complex internal features → injection molding
VolumeBlow moulds are an order of magnitude cheaper than injection moulds — a few thousand parts can justify one; injection needs tens of thousands
ToleranceWall thickness ±15% from the start; if a mating face needs ±0.1 mm, blow molding cannot hold it
Cost structureMaterial 55–70%, machine 20–35%, mould usually under 5% — unless the life figure is too short

For constant-section long products (pipe, profile, sheet) use the extrusion cost calculator; for the die head investment behind the parison, use the extrusion die cost estimator.

Four common mistakes

Not included

FAQ

Why does doubling cavities not halve the part cost?

Only machine time and mould amortisation scale with cavities; material and trimming are per part. In the default example, going from 2 cavities to 1 pushes machine cost from 0.65 to 1.30 and mould from 0.03 to 0.06, while material (1.07) and trimming (0.12) stay put — the total moves from 1.87 to 2.79, up 49%, not double.

Should mould changes and start-up be in the cycle time?

Not in continuous runs: one change covers hundreds of thousands of parts and rounds to nothing. In a pilot batch of a few thousand, it matters — two hours of changeover and tens of kilos of start-up scrap can be 20–30% of the part price. Spread them over the batch size or quote the batch as a whole.

The estimate is far below the moulder's quote — what am I missing?

Check three things first: whether mould cost is inside the part price (some shops invoice it separately), whether trimming is automated, and whether drying and inner liners are included. Then the exclusions — bottles are bulky, so freight often costs more than the conversion. A 20% gap is normal; a twofold gap means asking about mould life and the actual resin grade (regrind-filled compounds are common).