Die Casting Mould Cost Estimator
The die casting cost calculator takes "mould cost" and "mould life" as inputs — but quotes just say "tooling included". This tool answers what that money is: from projected area and shot pressure it picks the machine tonnage bracket, then splits frame, cavity machining, slides, vacuum system and trial shots, applies steel and annual-volume factors, and returns cost per shot to paste straight back into the part cost page.
1. Inputs
| Selected machine tonnage | — t |
| Design clamp force (incl. 1.15 safety) | — kN |
| Frame / base plate / guide pins / ejector | — CNY |
| Cavity machining (roughing, cavity surface, parting line) | — CNY |
| Slides / side-core mechanisms | — CNY |
| Vacuum system interface | — CNY |
| Trial shots (machine time) | — CNY |
| Cavity factor | — × |
| Combined factor (steel × volume tier) | — × |
| Cost per shot (total ÷ reference life) | — CNY/shot |
| Reference life of this steel | — shots |
Put "cost per shot" and the reference life into the die casting cost calculator to get this tool's contribution to the unit cost. Life is a steel reference value; preheating, coatings and melt temperature control move it a lot.
±35%. Die casting tools are quoted discretely: the same 200 t die can differ by 40–80% depending on whether CAE is included, whether slides are made in-house or outsourced, and whether the cavity is nitrided or coated. This tool gives the order of magnitude and shows which line item eats the budget. Do not use it to argue a quote down to the cent — use it to point out the part that is clearly off.
Formula
total area (cm²) = projected area per part × cavities
design clamp (kN) = total area × pressure (MPa) × 0.1 × 1.15
machine tonnage = first standard bracket with tonnage × 9.80665 ≥ design clamp
cavity factor = 1 + 0.55 × (cavities − 1)
frame (CNY) = (10000 + 100 × tonnage) × (1 + 0.15 × (cavities − 1))
cavity (CNY) = 900 × projected area^0.8 × cavity factor
slides (CNY) = 0.09 × (frame + cavity) × number of slides
vacuum (CNY) = 6000 (only if ticked)
trial shots (CNY) = 3 runs × 3 h × (150 + 0.6 × tonnage) CNY/h
total (CNY) = sum of five items × steel factor × volume-tier factor
per shot (CNY) = total ÷ reference life (80k / 120k / 200k shots) Why price a die casting tool by tonnage rather than area, volume or perimeter? The die has to fit between the tie bars: frame size, plate thickness, guide pin diameter and ejector layout all follow the machine tonnage. The same 120 cm² cavity on a 160 t and an 800 t machine sits in frames whose weight differs three- or four-fold. Area drives the cavity item; tonnage drives the frame item. Keeping them separate is what stops a small part being quoted at a large-part price.
What the inputs mean
- Projected area — must include runners, overflow and vents. Die casting gating is much larger than injection moulding: for aluminium it is commonly 15–35% on top of the net area. Leave it out and the tonnage bracket drops, taking the frame and trial shots with it.
- Cavities — 1–4 is normal in die casting. Each extra cavity multiplies the cavity item by 1.55 but widens the frame by only 15%: frame, guide pins and trial shots are shared. Above four cavities the thermal balance and venting get hard to control, so the tool refuses more.
- Shot pressure — metal pressure on the projected area. Zinc flows well at 40 MPa; thin-wall aluminium wants 80 MPa; leak-tight parts (valve bodies, pump housings) run 90 MPa. Higher pressure means more tonnage for the same area.
- Mould steel — H13 is the workhorse; SKD61 is cleaner and more thermal-crack resistant; 1.2343 ESR is electro-slag remelted for large dies and high-gloss parts. The factor covers steel price and heat treatment; the life difference is thermal fatigue resistance.
- Slides — one per side-core position. Each needs its own slide base, angle pin, locking block and stop, at roughly 9% of frame + cavity. Parts with threads, side holes or undercuts usually hide the biggest line item here.
- Vacuum system — vacuum valve, seals, evacuation piping and accumulator port, fixed at 6,000 CNY. Common for leak-tight and thin-wall parts, unnecessary for plain structural castings.
- Annual output — counted in shots, not parts: cavities per shot do not change how many thermal cycles the die sees. Higher volume justifies heat treatment, nitriding and extra cooling circuits, hence 0.95 to 1.15.
Worked example
Projected area 120 cm², 2 cavities, 60 MPa, H13, one slide, no vacuum, 100k shots/year (page defaults):
| Total area | 120 × 2 = 240 cm² |
| Design clamp force | 240 × 60 × 0.1 = 1,440 kN, × 1.15 = 1,656 kN |
| Machine tonnage | 1,656 ÷ 9.80665 = 168.9 t → 200 t (160 t only gives 1,569 kN) |
| Cavity factor | 1 + 0.55 × 1 = 1.55 |
| Frame | (10,000 + 100 × 200) × 1.15 = 34,500 CNY |
| Cavity machining | 900 × 120^0.8 × 1.55 = 900 × 46.0622 × 1.55 = 64,256.82 CNY |
| Slides | 0.09 × (34,500 + 64,256.82) × 1 = 8,888.11 CNY |
| Trial shots | 3 × 3 × (150 + 0.6 × 200) = 9 × 270 = 2,430 CNY |
| Subtotal | 34,500 + 64,256.82 + 8,888.11 + 2,430 = 110,074.93 CNY |
| Total | 110,074.93 × (1.00 × 1.00) = ¥110,074.93 |
| Per shot | 110,074.93 ÷ 80,000 = ¥1.38/shot |
Same formula, different conditions:
| 500 cm² single cavity, thin wall 80 MPa, SKD61, no slides, vacuum, 400k shots/year | Design 4,600 kN → 500 t; frame (10,000 + 50,000) = 60,000; cavity 900 × 144.27 = 129,842.99; vacuum 6,000; trials 9 × 450 = 4,050 → 199,892.99 × (1.15 × 1.15 = 1.3225) = ¥264,358.48, ¥2.20/shot |
| 30 cm² zinc part, 4 cavities, 40 MPa, H13, no slides, no vacuum, 20k shots/year | Design 552 kN → 160 t; frame 26,000 × 1.45 = 37,700; cavity 900 × 15.1949 × 2.65 = 36,239.77; trials 9 × 246 = 2,214 → 76,153.77 × 0.95 = ¥72,346.08, ¥0.90/shot |
| Default case with three slides instead of one | Slides 8,888.11 × 3 = 26,664.34 → ¥127,851.16 (¥17,776 more) |
The first row is worth pausing on: a 500 cm² single-cavity die costs 2.4× the default case, not because the area is four times larger, but because the bracket jumps from 200 t to 500 t — frame and trial-shot machine time jump with it, and vacuum plus the higher volume factor stack on top. Conversely, if a 500 cm² part is quoted near the price of a 200 t die, check the cavity count and whether vacuum and slides were quietly dropped.
Four common mistakes
- Using the net projected area — runners, overflow and vents add 15–35%. Understate them and the tonnage bracket drops; the quote looks cheap and production spends the savings on flash and die repairs.
- Importing injection moulding cavity habits — 8 or 16 cavities is normal in moulding, 1–4 is normal in die casting. Thermal balance relies on die mass and cooling; more cavities mean the far ones fill and cool differently.
- Forgetting slides — parts with side holes, undercuts or threads often carry 10–25% of the tool cost in slides, and quotes rarely list them. Asking "how many slides, who makes them" before the order is cheaper than arguing afterwards.
- Treating the tool as one-off cost — an 80k–200k shot life has to be spread over the parts. Use the mould amortisation line in the die casting cost calculator, or paste in the cost per shot here.
Not included
- Design and CAE flow analysis (often quoted separately at 8–15% of the tool cost)
- Cavity heat treatment, nitriding, coating, welding repairs
- Quick-change mechanisms, spray/extraction robot tooling, die temperature controllers
- Trial-shot scrap material and machine downtime (machine time only)
- Freight, taxes and spares (spare cores, inserts)
- Injection moulds, stamping dies, extrusion dies and blow moulds — each is priced on a different basis; see injection mould cost, stamping die cost, extrusion die cost and blow mould cost
FAQ
Why compute tonnage first instead of pricing directly from area?
Because the frame is priced by tonnage, not by area. A die casting frame carries the clamp force and the shot impact: plate thickness, guide pin diameter and ejection force are all sized to the machine. The same 120 cm² cavity on a 160 t and an 800 t machine can sit in frames whose weight differs more than three-fold. Pricing "area × rate" overquotes small parts, underquotes large ones, and the error has no consistent direction.
H13 versus SKD61: is the 15% worth it?
It depends on total shots and surface requirements. They are the same family of hot-work tool steel; the difference is melt cleanliness and heat-treat stability. SKD61 resists heat checking better, so the cavity surface does not craze early. Above roughly 100k shots a year, or for visible surfaces, the extra 15% is usually repaid by one fewer repair; for prototype and small batches it is not.
The estimate and the toolmaker's quote differ a lot — which do I trust?
Look at which line differs. Frame steel weight and machining are fairly transparent; the gap usually sits in cavity machining hours, slide count and steel grade. If the quote is more than double, ask whether CAE, imported steel or outsourced slides are included. If it is half, check the tonnage bracket, cavity count and vacuum — the classic way to make a die casting tool "cheap" is to squeeze the cavity into a smaller frame, and the money comes back as flash, distortion and repairs in production.
References
- Castings — General dimensional and geometrical tolerances and machining allowances ISO · ISO 8062-3
- Product Standards for Die Castings NADCA · NADCA #401
- Non-ferrous metal spot prices SMM · 公开行情
Basis for the parameters above. Links go to the publisher or its search page; the standard text itself is sold by the publisher. Price references are public market ranges, not supplier quotations.